A group called the Institute for Transport and Development Policy (ITDP) strongly supports bus-rapid transit, saying that “BRT systems can be built in a fraction of the time of light rail, and BRT can cost 30 times less to construct and 3 times less to operate.”
ITDP’s proposal for “Gold Standard” bus-rapid transit in Boston. Click image to download the 17.7-MB report.
In major urban areas, the organization promotes what it called “Gold Standard” BRT, which means dedicated bus lanes designed to minimize conflict with other traffic, off-board fare collection, and platform-level loading and unloading. ITDP argues that such BRT can move far more people than light rail and nearly as many as the most crowded heavy-rail lines. “BRT also has the added ability . . . to offer a mix of local, limited, and express services, and to save time by eliminating inconvenient transfers.”